I have 11 weeks left on my arup placement and I think I'm in the process of changing projects.
I will be moved off kasc and move onto trumpington.
Kasc was very much calculation and analysis based. Trumpington will see me putting together scheme design stuff and a RIBA stage c report.....all very different from kasc!
This change in project will bode well for my presentation to directors in may. I will have seen arup the big machine mobilised on a massive job where I was doing detailed design...now I will see the tight knit arup team and work on a smaller conceptual design job.
Sense of achievement fairly high at the moment...though i did miss a planned 5pm run last night (not cool) will have to do one tonight rather than go to the pub, then might settle down to some painting (orks wont paint themselves!!!!)
- Posted using BlogPress from my iPhone